Core Active constraints viewer

Businessday: 2025-10-19

An Amun Analytics product.

Home

Scroll to the right for more columns!
Click on the rows in the small tables at the top to filter

This shows the price spread impact per active constraint per border per MTU. Unit is EUR/MWh. A positive value is contributing to the price spread, a negative one is relieving the price spread. These are all scaled to only show the flowbased domain part, filtering out the LTA part.
More details about the methodology in this CIGRE paper

mtu tso cnec_name cont_name AT-CZ AT-DE AT-HU AT-SI BE-DE BE-FR BE-NL CZ-DE CZ-PL CZ-SK DE-FR DE-NL DE-PL HR-HU HR-SI HU-RO HU-SI HU-SK PL-SK
2025-10-19 00:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 0.36903 0.61649 0.11727 0.14417 2.09530 4.72856 0.89245 0.24746 -0.04088 0.14525 6.82386 1.20285 0.20657 0.20065 0.06079 0.03819 0.26144 0.10651 -0.18613
2025-10-19 00:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 0.30992 0.51773 0.09849 0.12108 1.75965 3.97108 0.74949 0.20782 -0.03433 0.12198 5.73074 1.01016 0.17348 0.16851 0.05105 0.03208 0.21956 0.08945 -0.15631
2025-10-19 00:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.01554 1.69651 0.32272 0.39674 5.76606 13.01249 2.45594 0.68097 -0.11251 0.39970 18.77854 3.31012 0.56846 0.55218 0.16728 0.10511 0.71946 0.29311 -0.51221
2025-10-19 01:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.98856 1.65241 0.31316 0.38676 5.62251 12.95516 2.40717 0.66385 -0.10824 0.38821 18.57767 3.21534 0.55561 0.53397 0.16596 0.09813 0.69993 0.28719 -0.49644
2025-10-19 01:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.78048 1.30459 0.24725 0.30535 4.43902 10.22822 1.90049 0.52411 -0.08545 0.30649 14.66724 2.53854 0.43866 0.42157 0.13103 0.07748 0.55260 0.22674 -0.39195
2025-10-19 01:30:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 12.26944 6.77588 4.85661 1.68450 -0.34953 -0.36217 -0.24425 5.49356 2.34777 3.49428 -0.71170 -0.10528 -3.14580 1.96244 1.20968 0.19898 3.17212 3.91856 -1.14651
2025-10-19 01:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.85189 1.42396 0.26987 -0.33329 4.84518 11.16406 2.07437 -0.57207 -0.09327 0.33454 16.00924 2.77081 0.47880 0.46014 0.14302 0.08457 0.60316 0.24748 -0.42781
2025-10-19 01:45:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 17.87869 9.87363 7.07692 2.45460 -0.50933 -0.52774 -0.35592 8.00506 3.42110 5.09176 -1.03707 -0.15341 -4.58396 2.85961 1.76271 0.28995 4.62232 5.71001 -1.67066
2025-10-19 01:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.92595 1.54776 0.29333 -0.36227 5.26644 12.13472 2.25473 -0.62181 -0.10138 0.36362 17.40116 3.01171 0.52043 0.50015 0.15545 0.09192 0.65560 0.26900 -0.46500
2025-10-19 02:00:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 16.39424 9.05227 6.50790 2.25041 -0.46696 -0.48243 -0.31224 7.34196 3.13229 4.65835 -0.94939 -0.15472 -4.20967 2.59360 1.66390 0.28974 4.25749 5.22798 -1.52606
2025-10-19 02:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 0.75754 1.26625 0.24108 -0.29638 4.30745 9.91542 1.77938 -0.50871 -0.08294 0.29859 14.22287 2.52807 0.42577 0.41139 0.12607 0.07741 0.53746 0.21786 -0.38153
2025-10-19 02:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 3.03181 3.80192 1.48599 1.22666 -0.01315 -0.11767 -0.04437 -0.77011 0.29483 1.15501 -0.13082 0.03123 1.06495 0.10288 0.15646 -0.02071 0.25933 0.39081 -0.86017
2025-10-19 02:15:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 16.91227 9.33831 6.71354 2.32152 -0.48172 -0.49768 -0.32211 7.57396 3.23126 4.80554 -0.97939 -0.15960 -4.34269 2.67555 1.71647 0.29890 4.39202 5.39318 -1.57428
2025-10-19 02:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.15112 1.92413 0.36634 -0.45036 6.54541 15.06705 2.70387 -0.77301 -0.12603 0.45373 21.61246 3.84154 0.64698 0.62513 0.19157 0.11763 0.81671 0.33105 -0.57976
2025-10-19 02:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 1.47304 1.84721 0.72199 0.59599 -0.00639 -0.05717 -0.02156 -0.37417 0.14325 0.56117 -0.06356 0.01517 0.51742 0.04998 0.07602 -0.01006 0.12600 0.18988 -0.41793
2025-10-19 02:30:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 10.46514 5.77845 4.15427 1.43653 -0.29808 -0.30796 -0.19932 4.68669 1.99947 2.97362 -0.60604 -0.09876 -2.68721 1.65560 1.06214 0.18495 2.71774 3.33725 -0.97415
2025-10-19 02:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.67143 2.79385 0.53193 -0.65393 9.50398 21.87745 3.92603 -1.12242 -0.18300 0.65881 31.38143 5.57794 0.93942 0.90770 0.27817 0.17080 1.18586 0.48069 -0.84182
2025-10-19 02:45:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 2.90034 3.63705 1.42155 1.17347 -0.01258 -0.11257 -0.04245 0.73672 0.28205 1.10492 -0.12514 0.02987 1.01876 0.09842 0.14967 -0.01981 0.24809 0.37386 -0.82287
2025-10-19 02:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.11757 3.53958 0.67391 -0.82848 12.04075 27.71692 4.97396 1.42201 -0.23185 0.83466 39.75767 7.06679 1.19016 1.14998 0.35241 0.21639 1.50239 0.60899 -1.06651
2025-10-19 03:00:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 15.88278 8.77363 6.30622 2.18114 -0.45259 -0.46894 -0.31899 7.10915 3.02088 4.48633 -0.92153 -0.13359 -4.08827 2.50422 1.62086 0.27810 4.12508 5.09023 -1.46545
2025-10-19 03:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.15396 3.59517 0.68450 -0.84149 12.22986 27.76288 5.26559 -1.44121 -0.23235 0.84463 39.99273 6.96427 1.20886 1.19002 0.33597 0.21979 1.52598 0.62484 -1.07698
2025-10-19 03:15:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 16.25180 8.97748 6.45274 2.23182 -0.46310 -0.47984 -0.32640 7.27432 3.09106 4.59057 -0.94294 -0.13670 -4.18326 2.56240 1.65852 0.28456 4.22092 5.20850 -1.49950
2025-10-19 03:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.64955 4.42235 0.84199 -1.03510 15.04372 34.15061 6.47711 -1.77280 -0.28581 1.03896 49.19433 8.56662 1.48699 1.46382 0.41327 0.27036 1.87709 0.76860 -1.32477
2025-10-19 03:30:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 7.93402 4.38274 3.15018 0.00000 -0.22608 -0.23425 -0.15935 3.55127 1.50904 2.24108 -0.46034 -0.06674 -2.04224 1.25095 0.80968 0.13892 2.06062 2.54275 -0.73205
2025-10-19 03:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.78894 4.65501 0.88628 -0.00000 15.83517 35.94725 6.81786 -1.86607 -0.30085 1.09362 51.78241 9.01730 1.56522 1.54083 0.43501 0.28459 1.97584 0.80904 -1.39447
2025-10-19 03:45:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 0.71478 0.39484 0.28380 -0.09816 -0.02037 -0.02110 -0.01436 -0.31993 0.13595 0.20190 -0.04147 -0.00601 -0.18399 0.11270 0.07294 0.01252 0.18564 0.22908 -0.06595
2025-10-19 03:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.87799 4.80364 0.91458 1.12435 16.34076 37.09500 7.03555 1.92565 -0.31045 1.12854 53.43576 9.30521 1.61520 1.59003 0.44890 0.29367 2.03892 0.83487 -1.43899
2025-10-19 04:00:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 3.89665 2.15528 1.54513 -0.53581 -0.11118 -0.11486 -0.07367 -1.74137 0.73740 1.09037 -0.22604 -0.03751 -1.00397 0.61417 0.39516 0.06430 1.00933 1.26115 -0.35296
2025-10-19 04:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.80670 4.68464 0.88783 1.09649 15.93598 36.01244 6.54623 1.87795 -0.30276 1.10877 51.94842 9.38975 1.57519 1.55064 0.43369 0.28231 1.98433 0.81010 -1.41153
2025-10-19 04:15:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 12.43745 6.87929 4.93180 1.71020 -0.35487 -0.36662 -0.23515 5.55816 2.35367 3.48026 -0.72149 -0.11971 -3.20449 1.96032 1.26127 0.20522 3.22159 4.02539 -1.12660
2025-10-19 04:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.86358 4.77959 0.90583 -1.11872 16.25895 36.74230 6.67890 -1.91601 -0.30890 1.13124 53.00124 9.58005 1.60711 1.58206 0.44248 0.28803 2.02454 0.82651 -1.44014
2025-10-19 04:30:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 11.59945 6.41579 4.59951 1.59497 -0.33096 -0.34192 -0.21931 5.18367 2.19508 3.24577 -0.67288 -0.11165 -2.98858 1.82824 1.17629 0.19140 3.00453 3.75417 -1.05069
2025-10-19 04:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.95855 4.93810 0.93587 -1.15582 16.79816 37.96083 6.90040 -1.97955 -0.31914 1.16876 54.75899 9.89776 1.66041 1.63453 0.45715 0.29758 2.09168 0.85392 -1.48790
2025-10-19 04:45:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 8.18945 4.52968 3.24735 0.00000 -0.23366 -0.24140 -0.15484 3.65978 1.54977 2.29158 -0.47507 -0.07883 -2.11000 1.29077 0.83049 0.13513 2.12126 2.65052 -0.74181
2025-10-19 04:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.88244 4.81107 0.91179 -0.00000 16.36604 36.98432 6.72289 -1.92863 -0.31093 1.13869 53.35036 9.64315 1.61770 1.59249 0.44539 0.28992 2.03788 0.83196 -1.44962
2025-10-19 05:00:00+02:00 Apg Zaya 2 - Zaya 1 ZYRHU41 N-1 Slavetice - Durnrohr 2 6.64416 3.67338 2.63346 -0.91321 -0.18949 -0.19634 -0.12100 2.97078 1.25338 1.86294 -0.38583 -0.06849 -1.71740 1.06959 0.65066 0.11815 1.72025 2.14775 -0.60957
2025-10-19 05:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.98190 4.97707 0.94325 1.16494 16.93509 37.81272 6.77664 -1.99518 -0.32601 1.17363 54.74781 10.15845 1.66917 1.64309 0.46511 0.30428 2.10819 0.86501 -1.49964
2025-10-19 05:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 3.09787 3.88182 1.51487 0.00000 -0.01342 -0.12081 -0.04430 0.78395 0.29868 1.17760 -0.13424 0.03087 1.08263 0.10605 0.15639 -0.02148 0.26244 0.40540 -0.87892
2025-10-19 05:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.20587 5.35091 1.01410 -0.00000 18.20711 40.65288 7.28565 2.14504 -0.35050 1.26179 58.85998 10.92146 1.79454 1.76650 0.50004 0.32713 2.26654 0.92998 -1.61228
2025-10-19 05:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 3.29482 4.12860 1.61118 0.00000 -0.01428 -0.12849 -0.04711 0.83379 0.31767 1.25247 -0.14277 0.03284 1.15145 0.11279 0.16633 -0.02284 0.27912 0.43117 -0.93480
2025-10-19 05:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.40968 5.69108 1.07857 -0.00000 19.36459 43.23731 7.74882 2.28140 -0.37278 1.34200 62.60190 11.61577 1.90862 1.87880 0.53183 0.34793 2.41063 0.98911 -1.71478
2025-10-19 05:45:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 4.24750 5.32238 2.07705 1.71722 -0.01841 -0.16565 -0.06074 1.07488 0.40952 1.61461 -0.18405 0.04233 1.48440 0.14540 0.21442 -0.02945 0.35983 0.55584 -1.20509
2025-10-19 05:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.45682 5.76977 1.09348 -1.35048 19.63232 43.83510 7.85595 2.31295 -0.37793 1.36056 63.46742 11.77637 1.93501 1.90478 0.53918 0.35274 2.44396 1.00278 -1.73849
2025-10-19 06:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 6.19200 7.76616 3.02890 2.50418 -0.03154 -0.24290 -0.09327 1.57417 0.59719 2.35454 -0.27444 0.06173 2.17136 0.21338 0.31134 -0.05167 0.52472 0.80856 -1.75735
2025-10-19 06:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.86128 4.94563 0.90642 -1.11945 16.10670 36.98777 6.92972 2.08435 -0.31328 1.12363 53.09446 9.17698 1.77107 1.57892 0.44694 0.29657 2.02587 0.83123 -1.43690
2025-10-19 06:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 10.15167 12.73249 4.96583 4.10555 -0.05170 -0.39823 -0.15291 2.58082 0.97908 3.86023 -0.44994 0.10121 3.55990 0.34983 0.51044 -0.08471 0.86027 1.32561 -2.88115
2025-10-19 06:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.84833 4.92325 0.90232 -1.11438 16.03381 36.82039 6.89837 2.07492 -0.31186 1.11854 52.85420 9.13545 1.76305 1.57178 0.44492 0.29523 2.01670 0.82747 -1.43040
2025-10-19 06:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 13.93882 17.48243 6.81836 5.63716 -0.07099 -0.54680 -0.20996 3.54361 1.34434 5.30032 -0.61779 0.13897 4.88795 0.48034 0.70087 -0.11631 1.18120 1.82014 -3.95598
2025-10-19 06:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.05735 5.28452 0.96853 -1.19616 17.21040 39.52234 7.40458 2.22718 -0.33475 1.20062 56.73274 9.80582 1.89243 1.68712 0.47757 0.31689 2.16469 0.88819 -1.53537
2025-10-19 06:45:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 15.32602 19.22230 7.49693 6.19817 -0.07806 -0.60122 -0.23085 3.89628 1.47813 5.82781 -0.67927 0.15280 5.37440 0.52814 0.77062 -0.12788 1.29876 2.00128 -4.34968
2025-10-19 06:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.70052 6.39623 1.17228 -1.44780 20.83096 47.83667 8.96228 2.69571 -0.40517 1.45320 68.66763 11.86868 2.29054 2.04204 0.57804 0.38356 2.62008 1.07504 -1.85836
2025-10-19 07:00:00+02:00 Apg Obersielach - Podlog 247 N-1 Maribor-Kainachtal 1 -0.18487 -0.16815 -0.26729 -0.52199 -0.00627 -0.00463 -0.00131 0.01673 0.01684 0.03756 -0.01090 -0.00497 0.03357 0.14824 0.10646 0.03883 0.25470 0.04485 0.02072
2025-10-19 07:00:00+02:00 Apg Obersielach - Podlog 247 N-1 Cirkovce-Podlog -0.86225 -0.82065 -1.18956 -2.65993 -0.03933 -0.03120 -0.01059 0.04160 0.07242 0.14428 -0.07053 -0.02874 0.11402 0.86093 0.60944 0.21991 1.47036 0.18304 0.07185
2025-10-19 07:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 15.05835 19.04828 7.30588 6.08060 -0.08834 -0.59874 -0.22412 3.98993 1.62607 5.79922 -0.68707 0.13578 5.61600 0.48913 0.73615 -0.13905 1.22528 1.95325 4.17315
2025-10-19 07:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.71770 4.75499 0.83163 -1.07435 15.33931 35.17894 6.24316 2.03728 -0.23079 1.10220 50.51824 9.09615 1.80650 1.45634 0.44963 0.28251 1.90597 0.78388 1.33299
2025-10-19 07:15:00+02:00 Apg Obersielach - Podlog 247 N-1 Cirkovce-Podlog -1.61955 -1.54141 -2.23434 -4.99610 -0.07387 -0.05860 -0.01989 0.07814 0.13603 0.27099 -0.13248 -0.05398 0.21416 1.61706 1.14469 0.41306 2.76176 0.34380 0.13496
2025-10-19 07:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 18.58557 23.51009 9.01718 7.50490 -0.10903 -0.73898 -0.27661 4.92452 2.00696 7.15762 -0.84801 0.16758 6.93148 0.60370 0.90858 -0.17162 1.51229 2.41077 5.15066
2025-10-19 07:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.00765 5.26229 0.92035 -1.18897 16.97584 38.93215 6.90923 2.25464 -0.25541 1.21979 55.90799 10.06661 1.99923 1.61171 0.49761 0.31265 2.10932 0.86751 1.47520
2025-10-19 07:30:00+02:00 Apg Obersielach - Podlog 247 N-1 Cirkovce-Podlog -1.85425 -1.76479 -2.55814 -5.72012 -0.08458 -0.06709 -0.02277 0.08946 0.15574 0.31026 -0.15167 -0.06181 0.24520 1.85141 1.31058 0.47292 3.16199 0.39362 0.15452
2025-10-19 07:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 20.34830 25.73988 9.87241 8.21669 -0.11937 -0.80907 -0.30285 5.39158 2.19731 7.83647 -0.92844 0.18348 7.58889 0.66096 0.99476 -0.18790 1.65572 2.63942 5.63916
2025-10-19 07:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.61245 4.57082 0.79942 -1.03274 14.74521 33.81644 6.00136 1.95838 -0.22185 1.05951 48.56165 8.74385 1.73653 1.39993 0.43222 0.27157 1.83215 0.75352 1.28136
2025-10-19 07:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -0.13667 0.88695 -0.57115 -0.19127 -0.11262 -0.06331 -0.03706 1.02362 1.86755 0.70605 -0.17593 -0.07556 2.89117 -0.26021 -0.11968 -0.01280 -0.37989 -0.27157 -1.16150
2025-10-19 07:45:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 11.67922 14.77380 5.66642 4.71609 -0.06851 -0.46438 -0.17382 3.09458 1.26118 4.49786 -0.53289 0.10531 4.35576 0.37937 0.57096 -0.10785 0.95032 1.51494 3.23668
2025-10-19 07:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.47281 4.32651 0.75669 -0.97754 13.95706 32.00891 5.68058 1.85370 -0.20999 1.00288 45.96597 8.27648 1.64371 1.32511 0.40912 0.25706 1.73422 0.71324 1.21287
2025-10-19 07:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -0.11206 0.72725 -0.46831 -0.15683 -0.09234 -0.05191 -0.03039 0.83931 1.53129 0.57893 -0.14426 -0.06195 2.37060 -0.21335 -0.09813 -0.01049 -0.31149 -0.22267 -0.95236
2025-10-19 08:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 15.89746 20.03152 7.68099 6.39996 -0.07404 -0.63707 -0.23589 4.13406 1.74936 6.17096 -0.71111 0.16185 5.88342 0.54754 0.73349 -0.15841 1.28103 2.04551 4.42160
2025-10-19 08:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.60562 6.22167 1.10011 -1.42119 20.36519 46.74150 8.25872 2.61605 -0.30003 1.46857 67.10668 12.10647 2.31602 1.93703 0.58427 0.36846 2.52130 1.03695 1.76860
2025-10-19 08:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 10.06780 12.68588 4.86434 4.05307 -0.04689 -0.40345 -0.14939 2.61809 1.10786 3.90805 -0.45034 0.10250 3.72595 0.34675 0.46452 -0.10032 0.81127 1.29541 2.80018
2025-10-19 08:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.44612 5.94644 1.05144 -1.35832 19.46427 44.67375 7.89337 2.50032 -0.28676 1.40360 64.13802 11.57090 2.21356 1.85134 0.55842 0.35216 2.40977 0.99107 1.69036
2025-10-19 08:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 2.55825 3.22351 1.23604 -1.02990 -0.01191 -0.10252 -0.03796 0.66526 0.28151 0.99304 -0.11443 0.02605 0.94677 0.08811 0.11803 -0.02549 0.20615 0.32917 -0.71153
2025-10-19 08:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.73873 4.72581 0.83561 1.07950 15.46883 35.50355 6.27309 1.98708 -0.22789 1.11548 50.97238 9.19574 1.75918 1.47132 0.44379 0.27987 1.91511 0.78764 -1.34338
2025-10-19 08:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.27117 3.91901 0.69296 0.89521 12.82798 29.44235 5.20214 1.64784 -0.18899 0.92505 42.27032 7.62583 1.45885 1.22013 0.36803 0.23209 1.58816 0.65317 -1.11403
2025-10-19 09:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 1.55385 1.96966 0.75475 -0.62930 -0.00728 -0.06146 -0.02404 0.41581 -0.15847 0.59950 -0.06874 0.01676 0.57427 0.05638 0.06908 -0.01727 0.12545 0.19961 0.44103
2025-10-19 09:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.32813 5.76811 1.01991 1.31759 18.88055 43.03634 7.99337 2.43998 0.31232 1.35175 61.91689 10.88718 2.12766 1.82998 0.50752 0.33184 2.33750 0.95647 1.66407
2025-10-19 09:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.83811 4.91883 0.86974 1.12359 16.10063 36.69978 6.81645 2.08072 -0.26633 1.15272 52.80041 9.28418 1.81439 1.56054 0.43279 0.28298 1.99333 0.81564 -1.41905
2025-10-19 09:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.48751 4.31120 0.76230 0.98479 14.11170 32.16622 5.97440 1.82369 -0.23343 1.01032 46.27793 8.13730 1.59026 1.36777 0.37933 0.24802 1.74709 0.71489 -1.24376
2025-10-19 09:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.92575 5.07073 0.89660 1.15829 16.59786 37.83317 7.02696 2.14498 -0.27456 1.18832 54.43103 9.57090 1.87042 1.60874 0.44616 0.29172 2.05489 0.84083 -1.46288
2025-10-19 09:45:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.12833 0.28958 0.06553 0.00201 -1.21364 0.40541 2.14245 0.16124 -0.05102 0.02932 -0.80823 -3.35609 0.11023 0.05102 0.01653 0.00747 0.06754 0.03348 -0.08033
2025-10-19 10:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.32703 5.81608 0.96270 1.42658 19.29381 45.42624 8.10559 2.48904 -0.33420 1.39167 64.72005 11.18821 2.15484 1.89546 0.49382 0.33420 2.38928 0.97267 -1.72587
2025-10-19 10:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.46949 6.06511 1.00392 1.48767 20.11995 47.37134 8.45267 2.59562 -0.34851 1.45126 67.49129 11.66728 2.24711 1.97662 0.51496 0.34851 2.49159 1.01432 -1.79977
2025-10-19 10:15:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.28316 0.64971 0.13995 0.01373 -2.76134 0.91979 4.73923 0.36654 -0.11869 0.06736 -1.84155 -7.50057 0.24785 0.11771 0.03597 0.01668 0.15368 0.07586 -0.18605
2025-10-19 10:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.84280 4.96957 0.82258 1.21895 16.48569 38.81468 6.92587 2.12677 -0.28556 1.18912 55.30037 9.55983 1.84121 1.61959 0.42195 0.28556 2.04153 0.83110 -1.47468
2025-10-19 10:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.05080 5.33318 0.88276 1.30814 17.69189 41.65461 7.43261 2.28238 0.30645 1.27612 59.34650 10.25928 1.97593 1.73809 0.45282 0.30645 2.19090 0.89191 1.58257
2025-10-19 11:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.42216 5.97341 0.99386 1.46518 19.81575 46.82418 8.26851 2.55125 0.34324 1.42932 66.63993 11.54723 2.20801 1.97235 0.48668 0.34324 2.45904 0.99898 1.77256
2025-10-19 11:00:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.17481 0.40063 0.08670 0.00847 -1.70273 0.56778 2.89313 0.22582 0.07339 0.04174 -1.13495 -4.59585 0.15243 0.07379 0.02137 0.01069 0.09517 0.04637 0.11513
2025-10-19 11:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.32156 5.79781 0.96464 1.42210 19.23321 45.44766 8.02544 2.47625 0.33315 1.38730 64.68088 11.20777 2.14310 1.91437 0.47238 0.33315 2.38675 0.96962 1.72045
2025-10-19 11:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.89706 3.31133 0.55094 0.81221 10.98476 25.95674 4.58361 1.41427 0.19027 0.79233 36.94150 6.40115 1.22400 1.09336 0.26979 0.19027 1.36316 0.55378 0.98261
2025-10-19 11:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.32591 2.31438 0.38507 0.56768 7.67755 18.14190 3.20361 0.98848 0.13299 0.55378 25.81945 4.47394 0.85549 0.76418 0.18856 0.13299 0.95275 0.38705 0.68677
2025-10-19 12:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.28846 2.36868 0.26029 0.78088 8.39234 19.76288 3.52916 1.08022 0.14750 0.60302 28.15522 4.86317 0.93272 0.81776 0.22342 0.14533 1.04118 0.42515 0.75052
2025-10-19 12:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.16977 0.31209 0.03430 0.10289 1.10576 2.60393 0.46500 0.14233 0.01943 0.07945 3.70969 0.64076 0.12289 0.10775 0.02944 0.01915 0.13718 0.05602 0.09889
2025-10-19 13:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.51646 0.94142 0.08807 0.31381 3.30738 7.60577 1.34501 0.42497 0.07525 0.23685 10.91314 1.96236 0.34972 0.31808 0.08380 0.07354 0.40188 0.19153 0.31210
2025-10-19 13:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.76004 1.38544 0.12961 0.46181 4.86728 11.19297 1.97938 0.62540 0.11073 0.34856 16.06025 2.88790 0.51466 0.46810 0.12332 0.10822 0.59142 0.28187 0.45930
2025-10-19 13:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.28565 0.52069 0.04871 0.17356 1.82928 4.20668 0.74391 0.23504 -0.04162 0.13100 6.03596 1.08537 0.19343 0.17593 0.04635 0.04067 0.22228 0.10594 -0.17262
2025-10-19 14:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.22979 0.41956 0.03925 0.13947 1.47400 3.34698 0.65430 0.18978 -0.03392 0.10556 4.82097 0.81969 0.15586 0.13909 0.03963 0.03277 0.17872 0.08498 -0.13947
2025-10-19 14:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.53904 0.98422 0.09208 0.32718 3.45774 7.85143 1.53489 0.44518 -0.07956 0.24762 11.30917 1.92285 0.36562 0.32629 0.09297 0.07688 0.41926 0.19935 -0.32718
2025-10-19 14:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.58627 2.89633 0.27096 0.96281 10.17529 23.10484 4.51680 1.31005 -0.23413 0.72869 33.28013 5.65849 1.07593 0.96018 0.27359 0.22623 1.23377 0.58663 -0.96281
2025-10-19 14:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.00612 3.66291 0.34267 1.21764 12.86842 29.22010 5.71228 1.65679 -0.29609 0.92155 42.08852 7.15615 1.36070 1.21432 0.34600 0.28611 1.56031 0.74190 -1.21764
2025-10-19 15:00:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 1.50570 2.78629 0.25762 0.91793 9.63947 22.04271 4.14442 1.28059 -0.22010 0.70533 31.68218 5.49505 1.06049 0.91042 0.26512 0.21510 1.17554 0.54275 -0.92543
2025-10-19 15:15:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 2.85595 5.28492 0.48864 1.74108 18.28374 41.80971 7.86097 2.42898 -0.41748 1.33783 60.09345 10.42278 2.01150 1.72685 0.50287 0.40799 2.22972 1.02947 -1.75532
2025-10-19 15:15:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.32504 0.75816 0.14450 0.03066 -3.24078 1.08166 5.32975 0.43313 -0.15102 0.08049 -2.15911 -8.57053 0.28211 0.13185 0.04331 0.02990 0.17517 0.10004 -0.23151
2025-10-19 15:30:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.36974 6.23569 0.57655 2.05431 21.57303 49.33138 9.27517 2.86596 -0.49259 1.57851 70.90441 0.00000 2.37337 2.03752 0.59334 0.48139 2.63086 1.21467 -2.07110
2025-10-19 15:30:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.46639 1.08789 0.20735 0.04400 -4.65020 1.55208 7.64766 0.62149 -0.21670 0.11550 -3.09811 -0.00000 0.40480 0.18920 0.06215 0.04290 0.25135 0.14355 -0.33220
2025-10-19 15:45:00+02:00 Rte L 400kV N0 1 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 2 3.92516 7.26350 0.67158 2.39291 25.12884 57.46249 10.80396 3.33834 -0.57378 1.83870 82.59132 0.00000 2.76456 2.37335 0.69114 0.56074 3.06449 1.41488 -2.41247
2025-10-19 15:45:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.54327 1.26720 0.24152 0.05125 -5.41667 1.80791 8.90820 0.72393 -0.25241 0.13454 -3.60877 -0.00000 0.47152 0.22038 0.07239 0.04997 0.29278 0.16721 -0.38695
2025-10-19 16:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.54132 4.41445 0.71566 1.01507 14.08682 32.77065 5.70702 1.87313 -0.31767 1.03333 46.85747 8.37979 1.55546 1.37655 0.35418 0.33592 1.73073 0.79234 -1.35099
2025-10-19 16:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 4.00320 6.95384 1.12734 1.59898 22.19018 51.62178 8.98995 2.95064 -0.50040 1.62774 73.81195 13.20022 2.45024 2.16840 0.55792 0.52916 2.72632 1.24813 -2.12814
2025-10-19 16:15:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.16405 0.36821 0.07895 0.00416 -1.52739 0.50823 2.29127 0.20416 -0.07082 0.03776 -1.01917 -3.81866 0.13334 0.06414 0.01897 0.01500 0.08311 0.04734 -0.10858
2025-10-19 16:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 4.73174 8.21936 1.33250 1.88998 26.22852 61.01633 10.62602 3.48762 -0.59147 1.92397 87.24485 15.60250 2.89615 2.56303 0.65945 0.62546 3.22248 1.47527 2.51544
2025-10-19 16:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 6.06837 10.54118 -1.70891 2.42386 33.63761 78.25235 13.62768 -4.47281 0.75855 -2.46746 111.88996 20.00993 -3.71426 -3.28703 -0.84574 -0.80214 -4.13277 1.89201 -3.22600
2025-10-19 16:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 11.37290 6.70028 38.91244 9.11668 -0.79505 -0.80091 -0.44734 4.67262 4.30928 8.86664 -1.59596 -0.34771 8.98190 21.85309 7.94267 0.86342 29.79575 59.15199 4.55737
2025-10-19 17:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.98955 6.87793 -1.28565 1.54509 22.27113 51.08005 9.02837 2.88839 -0.46698 1.59697 73.35119 13.24276 2.42140 2.22538 -0.60535 0.44392 2.83073 -1.10693 -2.06396
2025-10-19 17:00:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -0.77532 6.43239 4.04879 1.36097 -0.81780 -0.45973 -0.26476 7.20770 12.98009 5.11769 -1.27753 -0.55304 20.18779 -1.93298 0.75483 -0.08952 -2.68781 1.84422 7.86240
2025-10-19 17:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 5.38849 9.28970 -1.73646 2.08687 30.08055 68.99138 12.19419 3.90121 -0.63073 2.15695 99.07193 17.88636 3.27047 -3.00572 -0.81762 0.59959 -3.82334 -1.49507 -2.78769
2025-10-19 17:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 0.03607 0.01927 0.11911 0.02907 -0.00235 -0.00238 -0.00130 -0.01679 -0.00115 -0.03101 -0.00473 -0.00105 -0.01795 0.06437 0.02567 -0.00245 0.09004 -0.18619 0.02985
2025-10-19 17:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.64901 13.68095 8.61130 2.89464 -1.73936 -0.97779 -0.56311 15.32995 27.60715 10.88474 -2.71715 -1.17625 42.93710 4.11122 1.60544 -0.19039 5.71666 3.92244 16.72241
2025-10-19 17:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 5.07535 8.74985 -1.63556 1.96560 28.33251 64.98214 11.48556 3.67450 -0.59408 2.03161 93.31465 16.84695 3.08042 -2.83105 -0.77010 -0.56474 -3.60115 1.40819 -2.62569
2025-10-19 17:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 6.20697 3.31705 20.49857 5.00335 -0.40491 -0.40985 -0.22344 -2.88992 -0.19875 -5.33666 -0.81476 -0.18147 -3.08867 11.07824 4.41698 0.42219 15.49521 32.04221 5.13791
2025-10-19 17:30:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.24809 0.55284 -0.13037 0.00248 -2.32360 0.77838 3.48897 0.30475 -0.11002 0.05391 -1.54521 -5.81256 0.19473 -0.10094 -0.03191 -0.01650 -0.13285 0.06381 -0.16393
2025-10-19 17:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.88936 15.67503 9.86645 3.31655 -1.99289 -1.12031 -0.64519 17.56439 31.63106 12.47125 -3.11319 -1.34769 49.19544 4.71046 1.83944 0.21815 6.54990 -4.49416 19.15980
2025-10-19 17:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 7.40668 12.76903 -2.38683 2.86848 41.34683 94.83119 16.76136 5.36235 -0.86697 2.96481 136.17802 -24.58547 4.49538 -4.13147 -1.12385 0.82415 -5.25532 2.05503 -3.83178
2025-10-19 17:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 10.43372 5.57585 34.45741 8.41047 -0.68064 -0.68894 -0.37560 -4.85786 -0.33409 -8.97076 -1.36958 0.30504 -5.19196 18.62215 7.42479 -0.70969 26.04694 53.86189 8.63666
2025-10-19 17:45:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 2.69979 6.01616 -1.41874 0.02694 -25.28581 8.47051 37.96763 3.31637 -1.19724 0.58665 -16.81530 63.25344 2.11912 -1.09847 -0.34720 0.17959 -1.44567 0.69440 -1.78389
2025-10-19 17:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -0.82260 6.82465 4.29569 1.44397 -0.86767 -0.48776 -0.28091 7.64724 13.77164 5.42978 -1.35543 0.58676 21.41888 2.05086 0.80086 -0.09498 2.85172 -1.95668 8.34186
2025-10-19 18:00:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -3.38389 -4.17039 1.12291 -1.18959 17.28619 16.93310 13.43859 0.78649 -0.23792 1.31234 34.21930 3.84761 0.54858 1.82303 0.48947 0.36370 2.31250 -0.94864 1.55026
2025-10-19 18:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.89466 6.79567 -1.25634 1.54187 22.06593 50.22512 9.32548 -2.90101 0.53109 -1.47335 72.29106 12.74045 -2.36992 -2.20431 -0.59391 -0.43401 -2.79822 1.16497 -2.00444
2025-10-19 18:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 9.71620 5.22823 33.21902 8.21147 -0.65353 -0.66765 -0.37517 4.48797 0.61520 9.84932 -1.32118 -0.27835 5.10317 17.78848 7.21907 0.09884 25.00755 52.78454 9.23412
2025-10-19 18:15:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -0.48059 -0.59229 0.15948 -0.16895 2.45505 2.40490 1.90860 -0.11170 0.03379 -0.18638 4.85995 0.54645 -0.07791 0.25891 0.06952 -0.05165 0.32843 -0.13473 0.22017
2025-10-19 18:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 4.91884 8.58272 -1.58672 1.94734 27.86861 63.43283 11.77781 3.66389 -0.67075 1.86079 91.30144 16.09081 2.99314 -2.78398 -0.75009 0.54814 -3.53406 1.47132 -2.53154
2025-10-19 18:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 6.48380 3.48890 22.16768 5.47967 -0.43611 -0.44553 -0.25036 -2.99491 -0.41054 -6.57264 -0.88165 -0.18575 -3.40544 11.87059 4.81742 -0.06596 16.68802 35.22412 6.16210
2025-10-19 18:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.66030 11.67756 7.46305 2.50431 -1.49400 -0.84124 -0.50447 13.33786 23.53112 9.62089 -2.33523 -0.98953 36.86898 3.57145 1.38728 -0.19541 4.95873 -3.81814 13.91024
2025-10-19 18:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.47947 6.07121 -1.12241 1.37750 19.71359 44.87086 8.33134 2.59174 -0.47447 1.31628 64.58445 11.38225 2.11727 -1.96932 -0.53059 -0.38774 -2.49991 1.04078 -1.79075
2025-10-19 18:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 10.59055 5.69871 36.20837 8.95041 -0.71234 -0.72773 -0.40894 -4.89183 -0.67057 -10.73565 -1.44007 -0.30340 -5.56240 19.38925 7.86871 0.10773 27.25796 57.53456 10.06509
2025-10-19 18:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.53850 24.88762 15.90551 5.33728 -3.18406 -1.79288 -1.07514 28.42611 50.15035 20.50437 -4.97693 -2.10892 78.57647 7.61161 2.95662 0.41647 10.56823 -8.13736 29.64598
2025-10-19 18:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.53688 2.68166 -0.49577 0.60844 8.70751 19.81951 3.67996 1.14478 -0.20958 0.58140 28.52702 5.02755 0.93520 -0.86985 -0.23436 -0.17127 -1.10421 0.45971 -0.79098
2025-10-19 18:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 15.32159 8.24446 52.38349 12.94876 -1.03056 -1.05282 -0.59162 -7.07713 -0.97012 -15.53152 -2.08338 -0.43894 -8.04725 28.05088 11.38384 0.15586 39.43473 83.23660 14.56140
2025-10-19 18:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -4.32616 30.42754 19.44604 6.52535 -3.89282 -2.19197 -1.31446 34.75370 61.31370 25.06860 -6.08479 -2.57836 96.06740 9.30593 3.61476 0.50917 12.92069 -9.94872 36.24511
2025-10-19 19:00:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -5.92765 -7.28904 1.95999 -2.07918 30.21033 29.52434 23.27621 -1.36140 0.42113 -2.32020 59.73467 -6.93413 -0.94027 3.21809 0.82108 0.62243 4.03917 -1.64745 2.74134
2025-10-19 19:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 16.46870 8.86776 56.91461 13.94875 -1.10933 -1.12987 -0.64368 -7.60094 -1.04770 -16.75973 -2.23920 0.46564 -8.64864 31.16386 11.80200 0.55466 42.96586 90.14304 15.71203
2025-10-19 19:00:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 1.06062 2.38521 -0.56004 0.01308 -10.04500 3.37687 17.26366 1.32459 -0.49821 0.20689 -6.66813 27.30866 0.82638 -0.44113 -0.13198 -0.06896 -0.57312 0.29369 -0.70510
2025-10-19 19:00:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.42809 24.94989 15.95336 5.35233 -3.19126 -1.79990 -1.08645 28.37798 50.30534 20.54192 -4.99116 2.10481 78.68332 7.73837 2.86267 0.38189 10.60104 -8.01665 29.76343
2025-10-19 19:15:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -3.14401 -3.86609 1.03957 -1.10279 16.02348 15.65963 12.34564 -0.72208 0.22337 -1.23063 31.68310 3.67784 -0.49871 1.70687 0.43550 0.33013 2.14236 -0.87380 1.45400
2025-10-19 19:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 18.01114 9.69831 62.24515 15.25517 -1.21322 -1.23569 -0.70397 -8.31283 -1.14582 -18.32942 -2.44892 -0.50925 -9.45866 34.08262 12.90736 0.60661 46.98998 98.58571 17.18360
2025-10-19 19:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -4.29103 31.23042 19.96924 6.69964 -3.99459 -2.25298 -1.35994 35.52145 62.96850 25.71285 -6.24757 -2.63465 98.48996 9.68632 3.58327 0.47802 13.26959 -10.03464 37.25565
2025-10-19 19:30:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -2.08705 -2.56638 0.69009 -0.73205 10.63669 10.39516 8.19527 -0.47933 0.14828 -0.81692 21.03185 -2.44142 -0.33106 1.13305 0.28909 0.21915 1.42214 -0.58005 0.96519
2025-10-19 19:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 17.33772 9.33569 59.91785 14.68479 -1.16786 -1.18949 -0.67765 -8.00202 -1.10298 -17.64410 -2.35735 0.49021 -9.10500 32.80830 12.42476 0.58393 45.23306 94.89967 16.54112
2025-10-19 19:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.89615 28.35643 18.13156 6.08311 -3.62699 -2.04565 -1.23479 32.25258 57.17380 23.34661 -5.67263 2.39220 89.42638 8.79493 3.25352 0.43403 12.04845 -9.11120 33.82719
2025-10-19 19:45:00+02:00 Amprion Ensdorf - Vigy VIGY2 S N-1 Achene - Gramme 380.10 -0.24731 -0.30411 0.08177 -0.08675 -1.26042 -1.23180 -0.97112 -0.05680 0.01757 -0.09680 -2.49222 -0.28930 -0.03923 0.13426 0.03426 0.02597 0.16852 -0.06873 0.11437
2025-10-19 19:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 20.17719 10.86464 69.73084 17.08978 1.35913 1.38430 0.78863 -9.31255 -1.28362 -20.53375 2.74343 0.57050 -10.59617 38.18144 14.45962 0.67956 52.64106 110.44177 19.25013
2025-10-19 19:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.90308 28.40686 18.16381 6.09393 3.63344 2.04928 1.23699 32.30994 57.27548 23.38814 5.68272 2.39645 89.58542 8.81058 3.25931 0.43480 12.06988 -9.12741 33.88735
2025-10-19 20:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 7.12591 8.96708 -3.47225 -2.89703 -0.02481 -0.26513 -0.09690 1.84117 0.60235 2.68850 -0.28994 0.07210 2.44352 -0.27753 -0.29769 0.06900 -0.57522 0.96516 -2.08614
2025-10-19 20:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.30307 2.27177 -0.41843 0.51588 7.38469 16.78703 3.11437 0.96870 -0.18533 0.50823 24.17172 4.27032 0.78337 -0.74516 -0.18916 -0.14139 -0.93431 0.37640 -0.69357
2025-10-19 20:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 10.67483 5.71030 36.77277 8.98027 -0.71489 -0.72151 -0.41481 -4.96452 -0.62001 -10.65276 -1.43640 -0.30008 -5.58454 20.17803 7.61447 0.47880 27.79250 58.10036 10.03275
2025-10-19 20:00:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.06983 0.15659 -0.03683 0.00078 -0.65919 0.22056 1.13066 0.08676 -0.03300 0.01428 -0.43863 -1.78985 0.05376 -0.02902 -0.00858 -0.00453 -0.03761 0.01872 -0.04728
2025-10-19 20:00:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.76815 24.77761 15.93245 5.35288 -3.16066 -1.76668 -1.07703 28.54575 49.67260 19.82385 -4.92735 -2.08363 78.21836 7.72411 2.85546 0.37858 10.57957 -7.65955 29.84876
2025-10-19 20:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 18.56666 23.36386 -9.04701 -7.54826 0.06464 -0.69080 0.25248 4.79720 1.56944 7.00492 0.75543 -0.18785 6.36664 -0.72311 -0.77563 0.17977 -1.49875 2.51474 -5.43548
2025-10-19 20:15:00+02:00 Rte Ensdorf - Vigy VIGY2 S N-1 Muhlbach - Scheer -0.09624 -0.11170 0.02938 -0.03901 -0.73364 0.40079 -0.52339 -0.01546 0.00476 -0.04013 -1.13443 -0.21025 -0.01070 0.05472 0.01367 0.01070 0.06839 -0.02672 0.04490
2025-10-19 20:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.25199 0.43933 -0.08092 0.09976 -1.42809 3.24636 -0.60227 0.18733 -0.03584 0.09828 -4.67444 -0.82581 0.15149 -0.14410 -0.03658 -0.02734 -0.18068 0.07279 -0.13413
2025-10-19 20:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 15.74699 8.42356 54.24541 13.24726 1.05457 -1.06434 0.61191 -7.32342 -0.91461 -15.71444 2.11891 0.44266 -8.23804 29.76565 11.23250 0.70630 40.99815 85.70684 14.79983
2025-10-19 20:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -3.76044 24.72696 15.89988 5.34194 3.15420 -1.76307 1.07483 28.48740 49.57107 19.78332 4.91728 2.07937 78.05847 7.70832 2.84962 0.37780 10.55794 -7.64389 29.78774
2025-10-19 20:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 2.68052 3.37310 -1.30614 -1.08976 0.00933 -0.09973 0.03645 0.69258 0.22658 -1.01132 0.10906 -0.02712 0.91917 -0.10440 -0.11198 0.02595 -0.21638 0.36306 -0.78473
2025-10-19 20:30:00+02:00 Rte Ensdorf - Vigy VIGY2 S N-1 Muhlbach - Scheer -0.05214 -0.06051 0.01592 -0.02113 -0.39742 0.21711 -0.28353 -0.00837 0.00258 0.02174 -0.61453 -0.11389 -0.00580 0.02965 0.00740 0.00580 0.03705 -0.01448 0.02432
2025-10-19 20:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.26389 0.46007 -0.08474 0.10447 -1.49551 3.39963 -0.63071 0.19618 -0.03753 -0.10293 -4.89515 -0.86481 0.15864 -0.15091 -0.03831 -0.02863 -0.18921 0.07623 -0.14046
2025-10-19 20:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 19.34987 10.35086 66.65666 16.27821 1.29586 -1.30786 0.75192 -8.99901 -1.12388 19.30987 2.60371 0.54394 -10.12288 36.57597 13.80248 0.86790 50.37845 105.31640 18.18600
2025-10-19 20:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -2.90915 19.12927 12.30046 4.13263 2.44015 -1.36395 0.83151 22.03842 38.34916 -15.30477 3.80410 1.60864 60.38758 5.96331 2.20452 0.29227 8.16783 -5.91347 23.04439
2025-10-19 20:45:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 5.73221 7.21328 -2.79314 -2.33043 0.01996 0.21327 -0.07795 1.48107 0.48454 -2.16268 0.23323 -0.05800 1.96562 -0.22325 -0.23947 0.05550 -0.46272 0.77639 -1.67813
2025-10-19 20:45:00+02:00 Rte Ensdorf - Vigy VIGY2 S N-1 Muhlbach - Scheer -0.34785 -0.40373 0.10621 -0.14099 -2.65161 -1.44857 1.89171 -0.05588 0.01721 0.14506 -4.10019 -0.75990 -0.03867 0.19779 0.04940 0.03867 0.24720 -0.09658 0.16227
2025-10-19 20:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.07044 0.12281 -0.02262 0.02789 -0.39920 -0.90746 0.16835 0.05237 -0.01002 -0.02747 -1.30665 -0.23084 0.04235 -0.04028 -0.01023 -0.00764 -0.05051 0.02035 -0.03749
2025-10-19 20:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 21.03170 11.25052 72.45024 17.69306 1.40849 1.42153 -0.81727 -9.78117 -1.22156 20.98822 2.83002 0.59122 -11.00273 39.75503 15.00215 0.94334 54.75718 114.47015 19.76666
2025-10-19 20:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -2.26868 14.91780 9.59241 3.22280 1.90293 1.06366 -0.64845 17.18648 29.90627 -11.93530 2.96660 1.25449 47.09275 4.65044 1.71918 0.22793 6.36962 -4.61157 17.97097
2025-10-19 21:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 9.88183 12.43049 -4.81999 -4.01916 -0.03440 -0.36548 -0.13007 2.54866 0.83845 3.79988 -0.39987 0.09567 3.38710 -0.39127 -0.40955 0.09674 -0.80082 1.26197 -2.96143
2025-10-19 21:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.86140 1.50304 -0.27787 0.34102 4.88044 11.18056 1.97542 0.64163 -0.11999 0.34608 16.06101 2.90503 0.52164 -0.49764 -0.12125 -0.09473 -0.61890 0.23745 -0.46607
2025-10-19 21:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 10.27211 5.52310 35.22628 8.68768 -0.69092 -0.69305 -0.38171 -4.74901 -0.62481 -9.55986 -1.38397 -0.30921 -5.37382 19.37136 7.16723 0.10449 26.53859 55.05825 8.93505
2025-10-19 21:00:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -2.42353 17.04762 10.89170 3.65956 -2.18077 -1.20974 -0.71006 19.47114 34.00015 13.34962 -3.39051 -1.47070 53.47130 5.33054 1.90160 0.24883 7.23214 -4.88144 20.65054
2025-10-19 21:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 29.92902 37.64812 -14.59825 12.17280 -0.10418 -1.10691 0.39393 7.71910 2.53939 11.50866 -1.21109 0.28975 10.25849 -1.18505 -1.24040 0.29301 -2.42545 3.82211 -8.96926
2025-10-19 21:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.49256 0.85946 -0.15889 -0.19500 2.79072 6.39323 -1.12958 0.36690 -0.06861 0.19789 9.18394 1.66114 0.29828 -0.28456 -0.06933 -0.05417 -0.35390 0.13578 -0.26650
2025-10-19 21:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 8.72540 4.69146 29.92213 -7.37955 -0.58689 -0.58870 0.32424 -4.03394 -0.53073 -8.12040 -1.17558 -0.26265 -4.56467 16.45454 6.08804 0.08876 22.54258 46.76792 7.58967
2025-10-19 21:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -2.00112 14.07635 8.99336 -3.02173 -1.80068 -0.99889 0.58631 16.07747 28.07419 11.02288 -2.79957 -1.21437 44.15166 4.40147 1.57016 0.20546 5.97163 -4.03064 17.05131
2025-10-19 21:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.44158 2.51537 -0.46503 0.57071 8.16755 18.71096 3.30591 1.07379 -0.20081 0.57917 26.87851 4.86164 0.87298 -0.83282 -0.20292 -0.15853 -1.03574 0.39739 -0.77998
2025-10-19 21:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 9.53006 5.12411 32.68155 8.06009 -0.64101 -0.64299 -0.35414 -4.40595 -0.57968 -8.86926 -1.28400 -0.28687 -4.98562 17.97198 6.64948 0.09694 24.62146 51.08087 8.28959
2025-10-19 21:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.90040 13.36782 8.54068 2.86963 -1.71004 -0.94861 -0.55679 15.26822 26.66108 10.46805 -2.65865 -1.15325 41.92930 4.17992 1.49113 0.19512 5.67105 -3.82776 16.19303
2025-10-19 21:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.34303 5.83315 -1.07840 1.32349 18.94058 43.39078 7.66642 2.49012 -0.46567 1.34309 62.33136 11.27415 2.02445 -1.93131 -0.47057 0.36764 -2.40188 0.92154 -1.80877
2025-10-19 21:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 3.75707 2.02010 12.88417 3.17756 -0.25271 -0.25349 -0.13961 -1.73697 -0.22853 -3.49656 -0.50619 -0.11309 -1.96550 7.08516 2.62145 -0.03822 9.70661 20.13781 3.26804
2025-10-19 21:45:00+02:00 TennetBv PST MEE 2 N-1 Diele - Meeden SCHWARZ/Z 0.08822 0.19840 -0.04658 0.00109 -0.83553 0.27950 1.30512 0.11018 -0.04154 0.01909 -0.55603 -2.14065 0.06864 -0.03709 -0.01058 0.00574 -0.04767 0.02255 -0.06063
2025-10-19 21:45:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.78167 12.53267 8.00711 2.69035 -1.60321 -0.88935 -0.52201 14.31434 24.99545 9.81406 -2.49255 -1.08120 39.30979 3.91878 1.39797 -0.18293 5.31676 -3.58862 15.18138
2025-10-19 22:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 3.35838 5.63326 -1.07860 1.31884 19.14034 43.99238 8.11405 2.27488 -0.43634 -1.33845 63.13271 11.02628 1.83853 -1.92188 -0.47557 0.36280 -2.39744 0.94133 -1.77480
2025-10-19 22:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 12.53168 6.83046 42.62554 10.68193 -0.83841 -0.85414 -0.50043 -5.70122 -0.80959 11.67231 -1.69255 -0.33799 -6.51082 23.00663 8.93698 0.55283 31.94361 66.82953 10.86271
2025-10-19 22:00:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -0.98977 6.47077 4.13241 1.39039 -0.80733 -0.45612 -0.28051 7.46054 12.91949 -5.06821 -1.26344 -0.52681 20.38003 2.00843 0.73359 -0.08970 2.74202 -1.92557 7.85128
2025-10-19 22:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 21.68258 27.04759 -10.53321 0.00000 -0.09137 -0.79889 -0.30222 5.36500 1.96092 8.32161 -0.89026 0.21085 7.32592 -0.84809 -0.90901 -0.22022 -1.75710 2.82776 -6.36069
2025-10-19 22:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.69033 4.51268 -0.86405 -0.00000 15.33292 35.24136 6.49999 1.82235 -0.34955 1.07220 50.57428 8.83292 1.47281 -1.53958 -0.38097 0.29063 -1.92054 0.75408 -1.42175
2025-10-19 22:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 7.14499 3.89442 24.30313 -0.00000 -0.47803 -0.48699 -0.28532 -3.25057 -0.46159 -6.65501 -0.96501 -0.19270 -3.71217 13.11732 5.09546 0.31520 18.21278 38.10313 6.19342
2025-10-19 22:15:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.15982 7.58250 4.84239 -0.00000 -0.94603 -0.53448 -0.32871 8.74232 15.13916 5.93897 -1.48051 -0.61733 23.88148 2.35350 0.85962 -0.10511 3.21312 -2.25640 9.20019
2025-10-19 22:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 20.19516 25.19212 -9.81063 8.17407 -0.08510 -0.74409 -0.28149 4.99696 1.82640 7.75075 -0.82919 0.19639 6.82337 -0.78991 -0.84665 0.20512 -1.63656 2.63377 -5.92435
2025-10-19 22:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.88032 1.47662 -0.28273 -0.34570 5.01718 11.53155 2.12690 0.59630 -0.11438 0.35084 16.54873 2.89028 0.48193 -0.50377 -0.12466 -0.09510 -0.62843 0.24675 -0.46522
2025-10-19 22:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 3.82168 2.08303 12.99914 -3.25758 -0.25568 -0.26048 -0.15261 -1.73865 -0.24690 -3.55960 -0.51616 -0.10307 -1.98555 7.01613 2.72543 -0.16859 9.74157 20.38042 3.31271
2025-10-19 22:30:00+02:00 Pse Mikulowa PST1 N-1 Hagenwerder - Mikulowa 1 -1.13887 7.44554 4.75493 -1.59985 -0.92894 -0.52483 -0.32277 8.58442 14.86572 5.83170 -1.45377 -0.60617 23.45013 2.31099 0.84410 0.10322 3.15508 -2.21564 9.03402
2025-10-19 22:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.20892 0.35043 -0.06710 0.08204 1.19067 2.73664 0.50475 -0.14151 -0.02714 -0.08326 3.92731 0.68591 0.11437 -0.11955 -0.02958 0.02257 -0.14914 0.05856 -0.11041
2025-10-19 22:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 12.02327 6.55335 40.89621 10.24856 -0.80440 -0.81948 -0.48013 5.46992 -0.77675 11.19876 -1.62388 -0.32427 -6.24667 22.07324 8.57440 0.53040 30.64765 64.11824 10.42201
2025-10-19 23:00:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 30.51361 38.13045 -14.83401 12.37324 -0.12552 -1.11313 -0.43600 7.61684 2.81750 11.62345 -1.23865 0.31049 10.43435 -1.19901 -1.26177 -0.32040 -2.46077 4.05615 -8.80594
2025-10-19 23:00:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.17407 3.65205 -0.69926 -0.85501 12.40553 28.08804 5.39384 1.47798 -0.27335 0.85818 40.49357 7.01168 1.20464 -1.23960 -0.31467 0.23838 -1.55427 0.61662 -1.13153
2025-10-19 23:00:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 6.27575 3.42349 21.20675 -5.35389 -0.41891 -0.42547 -0.25476 -2.85225 -0.39921 -5.91725 -0.84438 -0.16415 -3.25146 11.38407 4.46879 0.36244 15.85286 33.39974 5.51804
2025-10-19 23:15:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 35.14453 43.91734 17.08531 14.25107 -0.14457 -1.28206 -0.50217 8.77282 3.24511 13.38749 -1.42663 0.35761 12.01792 -1.38098 -1.45326 -0.36902 -2.83424 4.67173 -10.14238
2025-10-19 23:15:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 1.06302 1.78569 0.34191 -0.41806 6.06575 13.73381 2.63735 0.72267 -0.13365 0.41961 19.79956 3.42840 0.58901 -0.60611 -0.15386 0.11656 -0.75997 0.30150 -0.55327
2025-10-19 23:15:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 4.49673 2.45302 -15.19516 -3.83619 -0.30016 -0.30486 -0.18254 -2.04371 -0.28604 -4.23985 -0.60502 -0.11762 -2.32975 8.15696 3.20200 0.25970 11.35897 23.93174 3.95381
2025-10-19 23:30:00+02:00 Apg Pleinting - St. Peter 258 N-1 Pirach - Pirach - Pleinting 296/257 23.90860 29.87669 11.62303 9.69491 -0.09835 -0.87218 -0.34163 5.96809 2.20762 9.10742 -0.97053 0.24328 8.17572 -0.93947 -0.98864 -0.25104 -1.92811 3.17815 -6.89980
2025-10-19 23:30:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 2.43060 4.08297 0.78177 -0.95589 13.86932 31.40230 6.03029 1.65238 -0.30560 0.95945 45.27163 7.83903 1.34678 -1.38587 -0.35180 0.26651 -1.73766 0.68938 -1.26505
2025-10-19 23:30:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 2.73541 1.49220 -9.24337 -2.33360 -0.18259 -0.18545 -0.11104 -1.24321 -0.17400 -2.57915 -0.36804 -0.07155 -1.41721 4.96197 1.94781 0.15798 6.90978 14.55793 2.40514
2025-10-19 23:45:00+02:00 Rte L 400kV N0 2 CREYS-ST-VULBAS-OUEST N-1 Creys-St.Vulbas 1 0.79156 1.32968 -0.25460 0.31130 4.51676 10.22664 1.96386 -0.53812 -0.09952 -0.31246 14.74340 2.55290 0.43860 -0.45133 -0.11457 0.08679 -0.56590 0.22451 -0.41198
2025-10-19 23:45:00+02:00 Mavir Levice - God N-1 R.Sobota - Sajoivanka 7.93655 4.32948 26.81886 6.77073 -0.52977 -0.53807 -0.32218 3.60707 -0.50486 7.48317 -1.06784 -0.20759 -4.11193 14.39672 5.65141 0.45836 20.04813 42.23858 6.97832